Anna Maria Residence

The Ann Maria Residence has steadily progressed in construction. CMU block walls have been built to the rooftop along with the concrete tie beams, allowing the master bedroom to cantilever over the pool (shown in the picture above). The roof deck is installed. We will start framing the interior this week and into the holiday break, allowing electrical and plumbing rough-ins to begin the following week.